2017 – 2020
Urengoy Condensate Pre-Transportation Preparation Plant for Achim deposit condensate treatment
- UDK-2 (condensate de-ethanization unit, Phase 2)
- Capacity as per feedstock — 5.9 MTA
- Phase 2 facilities. Revamping
Completed activities:
- Engineering survey
- Proekt and Detail Design Documentation (PD and RD)
- Designer field supervision
OTHER COMPLETED PROJECTS