CURRENT PROJECTS

GAZPROM PERERABOTKA

Gazprom Pererabotka LLC is a powerful complex based on interconnected processes, whose main activities include gas, gas condensate and oil treatment and processing, as well as trunkline hydrocarbon transportation.

Астраханский ГПЗ

2021 – now

Astrakhan GPP
  • Revamping of first priority process facilities of Astrakhan GPP
  • Revamping of Astrakhan GPP process units
  • Revamping of Astrakhan GPP for Ethane Fraction Recovery
  • Extension of sulphur granulation capacity, including state-of-the-art mechanized sulphur loading complexes
  • Technical upgrade of Astrakhan GPP facilities with installation of continuous automatic emission monitoring system
Scope of work:
  • Proekt Design Documentation (PD)
Оренбургский ГПЗ

2021 – now

Orenburg Gas Processing Complex
  • Revamping of Phase 1 of Orenburg GPP
  • Separate processing of gas from the Orenburg oil and gas condensate field and the Karachaganak field (9 bln m3) at GPP
  • Technical upgrade with replacement of worn-out and obsolete equipment at Orenburg Gas Processing and Helium Plants
Scope of work:
  • Proekt Design Documentation (PD)
Сургутский ЗСК

2021 – now

Surgut CSP
  • Expansion and upgrading of Surgut CSP facilities (Phase II)
  • Revamping and retrofitting of Surgut CSP
  • Revamping and retrofitting of Sugrut CSP LP waste gas disposal unit
  • Retrofitting of formation water recycling unit with methanol recovery & waste water treatment. Sugrut CSP, Site 2
Scope of work:
  • Proekt Design Documentation (PD)
Новоуренгойский ЗПКТ

2021 – now

Novy Urengoy Condensate Preparation for Transport Plant (CPTP)
  • Revamping of Urengoy CPTP facilities (Phase II) for processing of the Achim deposit condensate
Scope of work:
  • Proekt Design Documentation (PD)
УТЖУ «База Ново-Уренгойской ЛЭС»

2020 – now

Liquid hydrocarbon transport department – Novo Urengoy Line Operation and Maintenance Service Base
  • Revamping of Novo Urengoy Line Operation and Maintenance Service Base,
    YaNAO, 5 km southeast of Novy Urengoy
  • Modular boiler house
Scope of work:
  • Engineering survey
  • Proekt and Detail Design Documentation (PD and RD)
Астраханский ГПЗ

2017 – now

Astrakhan GPP
  • Dry sulphur granulation complex. Capacity – 3 MTA
  • Extension of dry sulphur granulation capacity, including state-of-the-art mechanized sulphur loading complexes
Scope of work:
  • Engineering survey
  • Main technical solutions
  • Proekt Design Documentation (PD)