COMPLETED PROJECTS

GAZPROM NEFTEKHIM SALAVAT

Gazprom neftekhim Salavat is one of the leading companies of Gazprom Group in oil refining, petrochemistry and mineral fertilizers production. The company comprises a refinery, a gas and chemical plant and “Monomer” Plant.

Gas Chemical Plant

2019 – 2021

Gas Chemical Plant

Natural gas processing complex for ethylene and propylene production with olefin polymerisation

Completed activities:
  • Investment feasibility study (TEOI)
Нефтеперерабатывающий завод

2017 – 2020

Gazprom neftekhim Salavat LLC. Refinery

AVT tank farm of shop 3
(Intake capacity — 1240 t/hour; pumpout capacity — 1205 t/hour. Grass root facility)

Tanks:

  • Grass root facilities:
    • Vertical steel tank, 5000 m3, without floating roof for diesel fuel (R-48)
    • Vertical steel tank, 5000 m3, with floating roof for gasoline (R-31)
    • Vertical steel tank, 5000 m3, with floating roof for gasoline (R-66)
    • Vertical steel tanks, 5000 m3, with floating roof for cruel oil (R-21, R-8, R-14)
    • Vertical steel tanks, 1000 m3 (R-6, R-7)
  • Revamping:
    • Upgrade of interfarm pipeline scheme for Refinery Feed & Product Dpt
Completed activities:
  • Engineering surveys
  • Proekt and Detail Design Documentation (PD and RD)
  • Designer field supervision
Нефтеперерабатывающий завод

2017 – 2019

Gazprom neftekhim Salavat LLC. Refinery

Revamping.

Tanks and tank farms:

  • Pneumo-framed module for storage of ESK equipment
  • Replacement of floating roof of vertical steel tank (5000 m3)
  • Tank farm 10-32 of refinery shop 10
  • Retrofitting. Installation of gasoline loading system at loading rack
Completed activities:
  • Detail Design Documentation (RD)
  • Proekt Design Documentation (PD) update in line with current regulations
Нефтеперерабатывающий завод

2017 – 2019

Gazprom neftekhim Salavat LLC. Refinery

HDT unit (GO-4)

  • Revamping
    Approval of design capacity increase up to 2.14 MTA and calculation of maximum possible load of existing equipment of stabilization and rectification section of HDT unit GO-4.
  • Retrofitting of GO-4 unit of Production department 11 of the Refinery
  • Retrofitting of fuel supply system to burners of GO-4 furnaces. Production department 11 of the Refinery
  • Replacement of existing pneumatic control system with APCS for GO-4 at the Refinery
Completed activities:
  • Proekt and Detail Design Documentation (PD and RD)
Сургутский ЗСК

2019

Gazprom neftekhim Salavat LLC. Gas Chemical Plant

Revamping of propylene recovery unit at EP-340 plant for additional processing of propane-propylene fraction (PPF) from catalytic cracking complex

Completed activities:
  • Technical and economic study
Новоуренгойский ЗПКТ

2018

Gazprom neftekhim Salavat LLC. Gas Chemical Plant

Natural gas processing complex for ethylene and propylene production with olefin polymerisation

Completed activities:
  • Pre-investment study
Новоуренгойский ЗПКТ

2017 – 2018

Gazprom neftekhim Salavat LLC. Gas Chemical Plant

Construction of superabsorbent polymers (SAP) production.

  • SAP production capacity
  • 50 KTA (2 trains x 25 KTA)
Completed activities:
  • Investment feasibility study (TEOI)
Нефтеперерабатывающий завод

2017 – 2018

Gazprom neftekhim Salavat LLC. Refinery

Catalytic Cracking Complex

  • SAP production capacity
  • 50 KTA (2 trains x 25 KTA)
Completed activities:
  • Detail Design Documentation (RD)
  • Designer field supervision
Газпром нефтехим Салават

2017 – 2018

Gazprom neftekhim Salavat LLC

Draft standard for maximum permissible atmospheric emission values.

Completed activities:
  • Permissible atmospheric emissions (PDV) volume
Газпром нефтехим Салават

2017 – 2018

Gazprom neftekhim Salavat LLC
  • Technical upgrade.
  • Retrofitting of fire water pump house of Visbreaking unit
Completed activities:
  • Detail Design Documentation (RD)
Газпром нефтехим Салават

2017 – 2018

Gazprom neftekhim Salavat LLC (Acryl Salavat)
  • Installation of product return scheme from loading racks emergency tank cars and rail tanks to the tank farm system.
Completed activities:
  • Detail Design Documentation (RD)
  • Designer field supervision
Новоуренгойский ЗПКТ

2017 – 2018

Gazprom neftekhim Salavat LLC. Gas Chemical Plant

Ammonia unit (AM-76)
Capacity as per ammonia – 42.3 KTA

  • Basic Design Package for revamping of section for extraction of hydrogen and ammonia from purge and tank gases of ammonia unit AM-76
  • Approval of process regulations for ammonia production from natural gas
Completed activities:
  • Basic Design Package
  • Approval of process regulations
Газпром нефтехим Салават

2017 – 2018

Gazprom neftekhim Salavat LLC. Gas Chemical Plant

Revamping:

  • Technical and process measures for reduction of flare emissions
  • Arrangement of entrance spaces with heat curtains
  • Ventilation systems
  • Internal heat supply systems
  • Water supply systems
  • Heat curtains
  • Interior heating systems
  • Propylene circulation pipeline
  • Change of sulfuration pipeline routing
  • Waste gas supply line from Visbreaking, CDU/VDU-6 to OKiKG unit
Completed activities:
  • Detail Design Documentation (RD)
  • Designer field supervision
Нефтеперерабатывающий завод

2017 – 2018

Gazprom neftekhim Salavat LLC. Refinery

Feasibility study for change of configuration and capacity of light oil tank car loading unit of the refinery commodity and raw material shop

Completed activities:
  • Feasibility Studies
Нефтеперерабатывающий завод

2017

Gazprom neftekhim Salavat LLC. Refinery

Elemental sulphur recovery unit of the refinery shop 18
Capacity – 38 KTA

  • Technical upgrade
Completed activities:
  • Detail Design Documentation (RD)
  • Designer field supervision
Завод «Мономер»

2016 – 2018

Gazprom neftekhim Salavat LLC. Monomer Petrochemical Plant
  • Construction of tank R-3 at facility 1140 of Monomer Plant commodity and raw material shop
  • Construction of tank R-5 at facility 1140 of Monomer Plant commodity and raw material shop
Completed activities:
  • Engineering surveys
  • Proekt and Detail Design Documentation (PD and RD)
  • Designer field supervision
Газпром нефтехим Салават

2016 – 2017

Gazprom neftekhim Salavat LLC.
  • Design of system for monitoring of quantity and quality of petroleum products at Gazprom neftekhim Salavat LLC
Completed activities:
  • Engineering surveys
  • Proekt and Detail Design Documentation (PD and RD)
Нефтеперерабатывающий завод

2013 – 2017

Gazprom neftekhim Salavat LLC. Refinery
  • Hydrogen plant. Grass root facility.
    Plant capacity as per feedstock — 25 thousand Nm3/h.
Completed activities:
  • Engineering surveys
  • Proekt and Detail Design Documentation (PD and RD)
  • Creation of engineering information models
  • Designer field supervision
Нефтеперерабатывающий завод

2012 – 2017

Gazprom neftekhim Salavat LLC. Refinery
  • HDT unit (GO-4) of the refinery shop 11
    Capacity as per feedstock – 2 MTA
  • Technical upgrade.
Completed activities:
  • Engineering surveys
  • Proekt and Detail Design Documentation (PD and RD)
  • Designer field supervision

OTHER COMPLETED PROJECTS