2019
Urengoy-Surgut condensate trunk pipeline
- Major overhaul of Urengoy-Surgut condensate trunk pipeline, Train 1
- Installation of temporary scraper stations
- Major overhaul of Urengoy-Surgut condensate trunk pipeline, Train 2
- Installation of temporary scraper stations
Completed activities:
- Engineering survey
- Proekt and Detail Design Documentation (PD and RD)
2019
Astrakhan GPP
- Development and approval of changes in process flow standard, alarm setpoints to ensure safe operation of Astrakhan GPP catalytic reforming unit Y-1.734
- Development and approval of changes to Astrakhan GPP Y151/251 unit shutdown procedure
- Determination of maximum process gas losses during unplanned shutdowns for units Y-74, Y-72, Y-41, Y-20 of Astrakhan GPP
- Design of temperature measurement in combustion chamber of F01/F11 reaction furnaces during start-up and shutdown of elemental sulfur recovery units
- Computations and analytics (process modelling, engineering calculations, analysis) of the impact of Y14/274 regeneration gas process parameters (pressure, temperature, quality) on sales gas quality; development of measures to eliminate this impact
Completed activities:
- Technical solutions
2018 – 2019
Astrakhan GPP
- Unit Y–1.732
- Diesel HDT section of combined fuel HDT unit
- Capacity – 1100 KTA as per feedstock
Completed activities:
- Preparation of analytical report (equipment sizing calculations)
2018 – 2019
Surgut CSP
- Propane fraction methanol removal unit with product dehydration section
Capacity as t feedstock – 420 KTA
Completed activities:
- Engineering surveys
- Proekt and Detail Design Documentation (PD and RD)
- Designer field supervision
2017 – 2018
Astrakhan GPP
- Amine treatment unit
- Capacity as per feedstock – 1.1 MTA x 2 units)
- Calculation of process variables limits with adsorbent MDEAms, brands E and DEA, with consideration for equipment condition.
Completed activities:
- Engineering surveys
- Calculation of process variables limits
2017 – 2018
Surgut CSP
- Antenna mast structure at Surgut CSP
Completed activities:
- Engineering surveys
- Proekt and Detail Design Documentation (PD and RD)
OTHER COMPLETED PROJECTS