Магистральный конденсатопровод «Уренгой-Сургут»

2019

Urengoy-Surgut condensate trunk pipeline
  • Major overhaul of Urengoy-Surgut condensate trunk pipeline, Train 1
  • Installation of temporary scraper stations
  • Major overhaul of Urengoy-Surgut condensate trunk pipeline, Train 2
  • Installation of temporary scraper stations
Completed activities:
  • Engineering survey
  • Proekt and Detail Design Documentation (PD and RD)
Астраханский ГПЗ

2019

Astrakhan GPP
  • Development and approval of changes in process flow standard, alarm setpoints to ensure safe operation of Astrakhan GPP catalytic reforming unit Y-1.734
  • Development and approval of changes to Astrakhan GPP Y151/251 unit shutdown procedure
  • Determination of maximum process gas losses during unplanned shutdowns for units Y-74, Y-72, Y-41, Y-20 of Astrakhan GPP
  • Design of temperature measurement in combustion chamber of F01/F11 reaction furnaces during start-up and shutdown of elemental sulfur recovery units
  • Computations and analytics (process modelling, engineering calculations, analysis) of the impact of Y14/274 regeneration gas process parameters (pressure, temperature, quality) on sales gas quality; development of measures to eliminate this impact
Completed activities:
  • Technical solutions
Астраханский ГПЗ

2018 – 2019

Astrakhan GPP
  • Unit Y–1.732
    • Diesel HDT section of combined fuel HDT unit
    • Capacity – 1100 KTA as per feedstock
Completed activities:
  • Preparation of analytical report (equipment sizing calculations)
Сургутский ЗСК

2018 – 2019

Surgut CSP
  • Propane fraction methanol removal unit with product dehydration section
    Capacity as t feedstock – 420 KTA
Completed activities:
  • Engineering surveys
  • Proekt and Detail Design Documentation (PD and RD)
  • Designer field supervision
Астраханский ГПЗ

2017 – 2018

Astrakhan GPP
  • Amine treatment unit
    • Capacity as per feedstock – 1.1 MTA x 2 units)
    • Calculation of process variables limits with adsorbent MDEAms, brands E and DEA, with consideration for equipment condition.
Completed activities:
  • Engineering surveys
  • Calculation of process variables limits
Сургутский ЗСК

2017 – 2018

Surgut CSP
  • Antenna mast structure at Surgut CSP
Completed activities:
  • Engineering surveys
  • Proekt and Detail Design Documentation (PD and RD)